PUBLIC DOCUMENTS

As part of various environmental authorisation processes, it is often a legislated requirement to place relevant information in the public domain and to obtain comments from stakeholders on the material published, these comments are to be submitted to the competent authorities to aid their decision making process.

One of the most effective means of doing so in the 21st century is to make documents available to download over the internet. Below you will be able to find public documents relevant to our projects, as well as notifications of public meetings and correspondence.

If you would like to register as an Interested and Affected Party (I&AP) for any of our projects, at any time, please feel free to correspond by sending an email to stakeholders@kongiwe.co.za.

We find public participation in our projects to be absolutely invaluable. By understanding public concerns and sentiments, we are able to bring these to the fore, enabling optimal project design which supports long-term benefit to our Client’s projects as well as the communities in which they occur.

_____________________________________________________________

Marievale Tailings Storage Facilities Reclamation Project

Background Information Document (BID): Ergo_BID_Marievale

Draft Scoping Report

Draft Scoping Report: DSR_Marievale_20191021_Public Review

{Public Review 23 October - 21 November 2019}

_____________________________________________________________

Valley Silts Rehabilitation Project

DMR Reference Number: GP 184 MR

Background Information Document (BID): Valley Silts_BID_Final

Final Scoping Report

Final Scoping Report: Valley_Silts_FSR_03092019

Appendix A: EIA Project Team CV's: Appendix A- Valley Silts_TeamCV

Appendix B: Maps: Appendix B - Valley Silts_Maps

Appendix C: Public Participation Material: Appendix C - PPP

 

_____________________________________________________________

Soweto Cluster Dumps Reclamation Project

Background Information Document (BID):  

SowetoCluster_BID

Final Scoping Report

Final Scoping Report: FSR_Soweto Cluster_Final

Appendix A: EIA Project Team CV's: Appendix A-Soweto Cluster FSR

Appendix B: Maps:Appendix B - Soweto Cluster FSR

Appendix C: Public Participation Material: Appendix C -Public Participation

_____________________________________________________________

City Deep Dumps Reclamation Project

DMR Reference Number: GP 185 MR

Background Information Document (BID):  City Deep BID

Final Environmental Impact Assessment Report

Environmental Impact Assessment Report: 1. CityDeep_EIA_FINAL

Environmental Management Programme Report: 2. CityDeep_EMPr_FINAL

Appendix A: EIA Project Team CV’s: 3. Appendix A CVs

Appendix B: Maps: 4. Appendix B Maps

Appendix C: Public Participation Information: 5. Appendix C PPP_Public

Appendix D: Specialist Studies 6. Appendix D Specialist Reports

_____________________________________________________________

Rooikraal TSF Reclamation Project

DMR Reference Number: GP 187 MR

Background Information Document (BID) : Rooikraal BID

Final Environmental Impact Assessment Report

Environmental Impact Assessment Report: 1. Rooikraal_EIA_FINAL

Environmental Management Programme Report: 2. Rooikraal_EMPr_FINAL

Appendix A: EIA Project Team CV’s: 3. Appendix A CVs

Appendix B: Maps:  4. Appendix B Maps

Appendix C: Public Participation Information:  5. Appendix C PPP Public

Appendix D: Specialist Studies : 6. Appendix D Specialist Reports

_____________________________________________________________

Leslie 1 Coal Mining Project

DMR Reference Number: MP30/5/1/2/2/10207MR

Final Environmental Impact Assessment Report

Final Environmental Impact Assessment Report: 1 Leslie 1_Final EIA_20180910

Final Environmental Management Programme Report: 2 Leslie 1_Final EMPR_20180910

Appendix A: EIA Project Team CV’s: Appendix A - CVs

Appendix B: Maps: Appendix B - Maps

Appendix C: Public Participation Information: Appendix C - PPP

Appendix D: Specialist Studies

Appendix D1 – Soil, Land Use and Land Capability: Appendix D1 – Soil

Appendix D2 – Surface Water: Appendix D2 – Surface Water

Appendix D3 – Groundwater: Appendix-D3-–-Groundwater-1

Appendix D4 – Biodiversity: Terrestrial Ecology: Appendix D4 – Biodiversity-Terrestrial Ecology

Appendix D5 – Biodiversity: Aquatic Ecology: Appendix D5 – Biodiversity-Aquatic Ecology

Appendix D6 – Biodiversity: Wetlands: Appendix D6 – Biodiversity-Wetlands

Appendix D7 – Air Quality: Appendix D7 – Air Quality

Appendix D8 – Noise: Appendix D8 – Noise

Appendix D9 – Blasting and Vibration: Appendix D9 – Blasting and Vibration

Appendix D10 – Visual: Appendix D10 – Visual

Appendix D11 – Traffic: Appendix D11 – Traffic  Appendix D11 – Traffic Independence

Appendix D12 – Heritage: Appendix D12 – Heritage

Appendix D13 – Palaeontology: Appendix D13 – Palaeontology

Appendix D14 – Social: Appendix D14 – Social

Appendix D15 – Community Health: Appendix D15 – Community Health

Appendix D16 – Climate Change: Appendix D16 – Climate Change

Appendix D17 – Closure and Rehabilitation: Appendix D17 – Closure and Rehabilitation

_____________________________________________________________

eMakhazeni Coal Mining Project

DMR Reference Number: MP30/5/1/2/2/10188MR

Final Environmental Impact Assessment Report

Final Environmental Impact Assessment Report for Public Comment: 1_eMakhazeni FEIAr_Submission- 20180426

Final Environmental Management Programme Report for Public Comment: 2_eMakhazeni FEMPr_Submission - 20180426

Appendix A: EIA Project Team CV’s:  Appendix A CVs - 20180426

Appendix B: A3 Maps:  Appendix B Maps - 20180426

Appendix C: Public Participation Information:  Appendix C PPP - 20180426

Appendix D: Specialist Impact Assessments

Appendix D1 – Biodiversity Impact Assessment (terrestrial and aquatic ecology and wetlands):  Appendix D1 - Biodiversity - 20180425

Appendix D2 – Soil Impact Assessment:   Appendix D2 - Soils 20180425

Appendix D3 – Hydropedology Impact Assessment:   Appendix D3 - Hydropedology - 20180425

Appendix D4 – Surface Water Impact Assessment:  Appendix D4 - Surface Water - 20180425

Appendix D5 – Groundwater Impact Assessment:  Appendix-D5-Groundwater-20180305a

Appendix D6 – Air Quality Impact Assessment:  Appendix D6 - Air Quality - 20180425

Appendix D7 –  Traffic Impact Assessment:  Appendix D7 - Traffic - 20180425

Appendix D8 – Noise Impact Assessment:  Appendix D8 - Noise - 20180425

Appendix D9 – Blasting and Vibration Impact Assessment:  Appendix D9 - Blasting - 20180425

Appendix D10 – Heritage Impact Assessment:  Appendix D10 - Heritage - 20180425

Appendix D11 – Visual Impact Assessment:  Appendix D11 - Visual - 20180425

Appendix D12 – Socio-economic and Tourism Impact Assessment: Appendix D12 - Social - 20180425

Appendix D13 – Community Health Impact Assessment:  Appendix D13 - Health - 20180425

Appendix D14 – Climate and Sustainability Impact Assessment:  Appendix D14 - Climate Change - 20180425

Appendix D15 – Rehabilitation, Decommissioning and Closure Costing:  Appendix D15 -Closure Plan - 20180425

_____________________________________________________________

Lephalale Coal & Power Project

DMR Reference Number: LP30/5/1/2/2/10140MR

Final EIA / EMPr Report

LCPP_Final_EIA_20171103 Part 1

LCPP_Final_EIA_20171103 Part 2

LCPP_Final_EIA_20171103 Part 3

LCPP_Final_EIA_20171103 Part 4

LCPP_Final_EIA_20171103 Part 5

Final EMPr Report:

LCPP_Final EMPr_20171103

Final Rehabilitation and Closure Report:

LCPP_Final_rehab_plan_20171103

Appendix A: Details of EAP: Appendix_A

Appendix B: Locality Maps and Site Layout Plans: Appendix_B

Appendix C: Comments and Response Report: Appendix_C

Appendix D: Public Participation:

Appendix D1: Stakeholder database: Appendix_D1

Appendix D2: Land Claims: Appendix_D2

Appendix D3: Petitions against the project: Appendix_D3

Appendix D4: Project notification letter and BIDs: Appendix_D4

Appendix D5: Newspaper advert: Appendix_D5

Appendix D6: List of Stakeholder Meetings: Appendix_D6 

Appendix D7: Site Notice report and placement map: Appendix_D7

Appendix D8: Scoping meeting minutes:Appendix_D8

Appendix D9: FSR notification letter: Appendix_D9

Appendix D10: Draft EIA notification:Appendix_D10

Appendix D11: Impact Phase meeting minutes:Appendix_D11

Appendix D12: Final EIA notification letter:Appendix_D12

Appendix D13: Stakeholder Engagement Plan:Appendix_D13

Appendix D14: Additonal Information:Appendix_D14 

Appendix E: Specialist Studies

Appendix E1: Biodiversity:

Appendix_E1-BIO_part1

Appendix_E1-BIO_part2

Appendix E2: Soils:

Appendix_E2-SOIL_part1

Appendix_E2-SOIL_part2

Appendix E3: Geohydrology: Appendix_E3-GROUNDWATER

Geohydrology Appendices: Appendix_E3-GROUNDWATER_Appendices

Appendix E4: Air Quality: Appendix_E4-AIR_QUALITYRev

Appendix E5: Climate Change: Appendix_E5-CLIMATE

Appendix E6: Noise: Appendix_E6-NOISE

Appendix E7: Blasting: Appendix_E7-BLASTING

Appendix E8: Traffic: Appendix_E8-TRAFFIC

Appendix E9: Visual:

Appendix_E9-VISUAL_part1

Appendix_E9-VISUAL_part2

Appendix E10: Heritage: Appendix_E10-HERITAGE

Appendix E11: Social: Appendix_E11-SOCIAL

Appendix E12: Community Health: Appendix_E12-HEALTH

_____________________________________________________________

Tanganani Bulk Infrastructure Project

GDARD Reference Numbers: GAUT 002/17-18/E2009

Pipeline Environmental Authorisation: Pipeline_Authorisation

Pipeline General Authorisation: Pipeline_GA_Authorisation

 

_____________________________________________________________

 

Comments are closed.