As part of various environmental authorisation processes, it is often a legislated requirement to place relevant information in the public domain and to obtain comments from stakeholders on the material, these comments are to be submitted to the competent authorities to aid their decision making process.
One of the most effective means of doing so is to make documents available to download over the internet. Below you will be able to find public documents relevant to our projects, as well as notifications of public meetings and correspondence.
If you would like to register as an Interested and Affected Party (I&AP) for any of our projects, at any time, please feel free to correspond by sending an email to stakeholders@kongiwe.co.za.
_____________________________________________________________
Driefontein Operations Environmental Authorisation Amendment
DMRE Reference Number: GP 30/5/1/2/2 (51) MR
(click on the document below to download)
Draft Part 2 Amendment Report Report
Appendix A: EIA Project Team CV’s
Appendix C: Public Participation Information
Appendix D: Driefontein EMPr-Draft Public review
(Public Review Period 13 November 2020 to 14 December 2020)
Draft IWWMP Amendment Report Report
Appendix A: EIA Project Team CV’s
Appendix C: Public Participation Information
Appendix D1: Surface Water Study
Appendix D2: Groundwater Assessment
Appendix D3: PCD Design and assessment Report
Appendix D4: Soil Assessment Report
Appendix D5: WWTW Design Review Report
(Public Review Period 20 November 2020 to 10 February 2021)
_____________________________________________________________
Makeean Polymers Atmospheric Emissions Licence
GDARD Reference Number: GAUT 002/20-21/E2548
Final Scoping Report
(click on the document below to download)
_____________________________________________________________
Marievale Tailings Storage Facilities Reclamation Project
DMRE Reference Number: GP 30/5/1/1/2 (000007BP) BAR
Final Environmental Impact Assessment Report
(click on the document below to download)
Appendix A: EIA Project Team CV’s
Appendix C: Public Participation Information
Appendix D: Specialist Studies
_____________________________________________________________
Beitbridge Border Expansion Project
_____________________________________________________________
Valley Silts Rehabilitation Project
DMRE Reference Number: GP 184 MR
Final Environmental Impact Assessment Report
(click on the document below to download)
Appendix A: EIA Project Team CV’s
Appendix C: Public Participation Information
Appendix D: Specialist Studies
_____________________________________________________________
Soweto Cluster Dumps Reclamation Project
DMRE Reference Number: GP 5/1/1/2 (000002) BP
Final Environmental Impact Assessment Report
Final EIA Report: Soweto_Cluster_FEIA
Appendix A: EIA Project Team CV’s: Soweto_App_A_CVs
Appendix B: Maps: Soweto_App_B_Mapping
Appendix C: Public Participation Information: Soweto_App_C_PPP
Appendix D: Specialist Studies: Soweto_App_D_Specialist_Studies
Appendix E: Environmental Management Plan report (EMPr): Soweto_App_E_EMPr
_____________________________________________________________
City Deep Dumps Reclamation Project
DMR Reference Number: GP 185 MR
DHSWS Reference: WU10460
Final Environmental Impact Assessment Report
Environmental Impact Assessment Report: 1. CityDeep_EIA_FINAL
Environmental Management Programme Report: 2. CityDeep_EMPr_FINAL
Appendix A: EIA Project Team CV’s: 3. Appendix A CVs
Appendix B: Maps: 4. Appendix B Maps
Appendix C: Public Participation Information: 5. Appendix C PPP_Public
Appendix D: Specialist Studies 6. Appendix D Specialist Reports
Environmental Authorisation (click on document below)
Environmental Authorisation Notification
_____________________________________________________________
Rooikraal TSF Reclamation Project
DMR Reference Number: GP 187 MR
DHSWS Reference: WU10460
Final Environmental Impact Assessment Report
Environmental Impact Assessment Report: 1. Rooikraal_EIA_FINAL
Environmental Management Programme Report: 2. Rooikraal_EMPr_FINAL
Appendix A: EIA Project Team CV’s: 3. Appendix A CVs
Appendix B: Maps: 4. Appendix B Maps
Appendix C: Public Participation Information: 5. Appendix C PPP Public
Appendix D: Specialist Studies : 6. Appendix D Specialist Reports
Environmental Authorisation (click on document below)
Environmental Authorisation Notification
_____________________________________________________________
Leslie 1 Coal Mining Project
DMR Reference Number: MP30/5/1/2/2/10207MR
Final Environmental Impact Assessment Report
Final Environmental Impact Assessment Report: 1 Leslie 1_Final EIA_20180910
Final Environmental Management Programme Report: 2 Leslie 1_Final EMPR_20180910
Appendix A: EIA Project Team CV’s: Appendix A - CVs
Appendix B: Maps: Appendix B - Maps
Appendix C: Public Participation Information: Appendix C - PPP
Appendix D: Specialist Studies
Appendix D1 – Soil, Land Use and Land Capability: Appendix D1 – Soil
Appendix D2 – Surface Water: Appendix D2 – Surface Water
Appendix D3 – Groundwater: Appendix-D3-–-Groundwater-1
Appendix D4 – Biodiversity: Terrestrial Ecology: Appendix D4 – Biodiversity-Terrestrial Ecology
Appendix D5 – Biodiversity: Aquatic Ecology: Appendix D5 – Biodiversity-Aquatic Ecology
Appendix D6 – Biodiversity: Wetlands: Appendix D6 – Biodiversity-Wetlands
Appendix D7 – Air Quality: Appendix D7 – Air Quality
Appendix D8 – Noise: Appendix D8 – Noise
Appendix D9 – Blasting and Vibration: Appendix D9 – Blasting and Vibration
Appendix D10 – Visual: Appendix D10 – Visual
Appendix D11 – Traffic: Appendix D11 – Traffic Appendix D11 – Traffic Independence
Appendix D12 – Heritage: Appendix D12 – Heritage
Appendix D13 – Palaeontology: Appendix D13 – Palaeontology
Appendix D14 – Social: Appendix D14 – Social
Appendix D15 – Community Health: Appendix D15 – Community Health
Appendix D16 – Climate Change: Appendix D16 – Climate Change
Appendix D17 – Closure and Rehabilitation: Appendix D17 – Closure and Rehabilitation
_____________________________________________________________
eMakhazeni Coal Mining Project
DMR Reference Number: MP30/5/1/2/2/10188MR
Final Environmental Impact Assessment Report
Final Environmental Impact Assessment Report for Public Comment: 1_eMakhazeni FEIAr_Submission- 20180426
Final Environmental Management Programme Report for Public Comment: 2_eMakhazeni FEMPr_Submission - 20180426
Appendix A: EIA Project Team CV’s: Appendix A CVs - 20180426
Appendix B: A3 Maps: Appendix B Maps - 20180426
Appendix C: Public Participation Information: Appendix C PPP - 20180426
Appendix D: Specialist Impact Assessments
Appendix D1 – Biodiversity Impact Assessment (terrestrial and aquatic ecology and wetlands): Appendix D1 - Biodiversity - 20180425
Appendix D2 – Soil Impact Assessment: Appendix D2 - Soils 20180425
Appendix D3 – Hydropedology Impact Assessment: Appendix D3 - Hydropedology - 20180425
Appendix D4 – Surface Water Impact Assessment: Appendix D4 - Surface Water - 20180425
Appendix D5 – Groundwater Impact Assessment: Appendix-D5-Groundwater-20180305a
Appendix D6 – Air Quality Impact Assessment: Appendix D6 - Air Quality - 20180425
Appendix D7 – Traffic Impact Assessment: Appendix D7 - Traffic - 20180425
Appendix D8 – Noise Impact Assessment: Appendix D8 - Noise - 20180425
Appendix D9 – Blasting and Vibration Impact Assessment: Appendix D9 - Blasting - 20180425
Appendix D10 – Heritage Impact Assessment: Appendix D10 - Heritage - 20180425
Appendix D11 – Visual Impact Assessment: Appendix D11 - Visual - 20180425
Appendix D12 – Socio-economic and Tourism Impact Assessment: Appendix D12 - Social - 20180425
Appendix D13 – Community Health Impact Assessment: Appendix D13 - Health - 20180425
Appendix D14 – Climate and Sustainability Impact Assessment: Appendix D14 - Climate Change - 20180425
Appendix D15 – Rehabilitation, Decommissioning and Closure Costing: Appendix D15 -Closure Plan - 20180425
_____________________________________________________________
Lephalale Coal & Power Project
DMR Reference Number: LP30/5/1/2/2/10140MR
Environmental Authorisation (click on document below)
Environmental Authorisation Notification
Final EIA / EMPr Report
LCPP_Final_EIA_20171103 Part 1
LCPP_Final_EIA_20171103 Part 2
LCPP_Final_EIA_20171103 Part 3
LCPP_Final_EIA_20171103 Part 4
LCPP_Final_EIA_20171103 Part 5
Final EMPr Report:
Final Rehabilitation and Closure Report:
LCPP_Final_rehab_plan_20171103
Appendix A: Details of EAP: Appendix_A
Appendix B: Locality Maps and Site Layout Plans: Appendix_B
Appendix C: Comments and Response Report: Appendix_C
Appendix D: Public Participation:
Appendix D1: Stakeholder database: Appendix_D1
Appendix D2: Land Claims: Appendix_D2
Appendix D3: Petitions against the project: Appendix_D3
Appendix D4: Project notification letter and BIDs: Appendix_D4
Appendix D5: Newspaper advert: Appendix_D5
Appendix D6: List of Stakeholder Meetings: Appendix_D6
Appendix D7: Site Notice report and placement map: Appendix_D7
Appendix D8: Scoping meeting minutes:Appendix_D8
Appendix D9: FSR notification letter: Appendix_D9
Appendix D10: Draft EIA notification:Appendix_D10
Appendix D11: Impact Phase meeting minutes:Appendix_D11
Appendix D12: Final EIA notification letter:Appendix_D12
Appendix D13: Stakeholder Engagement Plan:Appendix_D13
Appendix D14: Additonal Information:Appendix_D14
Appendix E: Specialist Studies
Appendix E1: Biodiversity:
Appendix E2: Soils:
Appendix E3: Geohydrology: Appendix_E3-GROUNDWATER
Geohydrology Appendices: Appendix_E3-GROUNDWATER_Appendices
Appendix E4: Air Quality: Appendix_E4-AIR_QUALITYRev
Appendix E5: Climate Change: Appendix_E5-CLIMATE
Appendix E6: Noise: Appendix_E6-NOISE
Appendix E7: Blasting: Appendix_E7-BLASTING
Appendix E8: Traffic: Appendix_E8-TRAFFIC
Appendix E9: Visual:
Appendix E10: Heritage: Appendix_E10-HERITAGE
Appendix E11: Social: Appendix_E11-SOCIAL
Appendix E12: Community Health: Appendix_E12-HEALTH
_____________________________________________________________
Tanganani Bulk Infrastructure Project
GDARD Reference Numbers: GAUT 002/17-18/E2009
Pipeline Environmental Authorisation: Pipeline_Authorisation
Pipeline General Authorisation: Pipeline_GA_Authorisation
_____________________________________________________________